Okay, a few things left:
- get two small clamps for coolant plumbing (check)
- get large clamp for exhaust (15cm) (check)
- get 3 gallons of distilled water for coolant (check)
- get chemicals for acrylic welding (Methylene Chloride) (check)
- verify industrial cooler operation (check)
- finish quick vent design (check)
- cut out window vent parts (check)
- assemble vent (check)
- install vent (check)
- install and verify plumbing (exhaust, water cooling and compressed air) (check)
- solder high voltage wires (check)
- go over nuts and bolts of mechanical to make sure everything is good
- go over nuts and bolts of cabinet to make sure everything is good
- align laser (check)
- adjust mirrors (progress)
- go through focus procedure for first time
- figure out how to vector cut with software (raster is already done)
- cut! will be operational at this point if everything works!
- pick up corel in ogdensburg
- mount chiller, blower and compressor on a sound absorbing base to prevent drift and reduce noise